IT-Tests.com is a specialized IT certification exam training website which provide you the targeted exercises and current exams. We focus on the popular EMC certification E20-017 exam and has studied out the latest training programs about EMC certification E20-017 exam, which can meet the needs of many people. EMC E20-017 certification is a reference of many well-known IT companies to hire IT employee. So this certification exam is very popular now. IT-Tests.com is also recognized and relied by many people. IT-Tests.com can help a lot of people achieve their dream. If you choose IT-Tests, but you do not successfully pass the examination, IT-Tests.com will give you a full refund.
IT-Tests.com's EMC E20-017 exam training materials are the best training materials of all the Internet training resources. Our visibility is very high, which are results that obtained through many candidates who have used the IT-Tests.com's EMC E20-017 exam training materials. If you also use IT-Tests.com's EMC E20-017 exam training materials, we can give you 100% guarantee of success. If you do not pass the exam, we will refund the full purchase cost to you . For the vital interests of the majority of candidates, IT-Tests.com is absolutely trustworthy.
In IT-Tests's website you can free download study guide, some exercises and answers about EMC certification E20-017 exam as an attempt.
Exam Code: E20-017
Exam Name: EMC Information Availability Design Specialist Exam for Data Center Architects E20-017
Free One year updates to match real exam scenarios, 100% pass and refund Warranty.
Updated: 2013-08-22
IT-Tests.com has gained the reputation of the many certification industry, because we have a lot of high-quality EMC E20-017 Exam E20-017 study guide, E20-017 exam, E20-017 exam answer. As the most professional supplier on the site of IT certification test currently , we provide a comprehensive after-sales service. We provide tracking services to all customers. Within one year of your purchase, enjoy free upgrades examination questions service. During this period, if EMC's E20-017 test questions are modified, We will be free to provide customers with protection. EMC E20-017 certification exam is carefully crafted by our IT-Tests.com IT experts. With the IT-Tests.com of EMC E20-017 exam materials, I believe that your tomorrow will be better.
If you have IT-Tests.com's EMC E20-017 exam training materials, we will provide you with one-year free update. This means that you can always get the latest exam information. As long as the Exam Objectives have changed, or our learning material changes, we will update for you in the first time. We know your needs, and we will help you gain confidence to pass the EMC E20-017 exam. You can be confident to take the exam and pass the exam.
From IT-Tests.com website you can free download part of IT-Tests's latest EMC certification E20-017 exam practice questions and answers as a free try, and it will not let you down. IT-Tests.com latest EMC certification E20-017 exam practice questions and answers and real exam questions is very close. You may have also seen on other sites related training materials, but will find their Source IT-Tests.com of you carefully compare. The IT-Tests.com provide more comprehensive information, including the current exam questions, with their wealth of experience and knowledge by IT-Tests.com team of experts to come up against EMC certification E20-017 exam.
E20-017 (Information Availability Design Specialist Exam for Data Center Architects) Free Demo Download: http://www.it-tests.com/E20-017.html
NO.1 A company has a system with three critical components as represented in the exhibit.
Each component must be functioning for the system to be operational. Following an outage, certain
components seem to take longer to restore back to service than others.
What is the mean time to repair (MTTR) for Component 3?
A. 2 hours
B. 3 hours
C. 5 hours
D. 10 hours
Answer: C
EMC demo E20-017 E20-017 study guide E20-017
NO.2 A company has estimated a cost of $240,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $35,000 per month. In addition, the
company has agreed to spend $2,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A
EMC E20-017 E20-017 certification training E20-017
NO.3 A company has a shared pre-staged infrastructure at an alternate site. This approach enables the
company to rebuild systems and applications in the event of a disaster.
What is the term for this strategy?
A. Hot site
B. Manual failover site
C. Cold site
D. Warm site
Answer: A
EMC E20-017 E20-017 exam prep E20-017 E20-017 questions
NO.4 In which focus area of the Information Availability Design Framework can platform integrity be found?
A. Store
B. Automate
C. Create copies
D. Distribute
Answer: A
EMC E20-017 answers real questions E20-017 E20-017 E20-017 E20-017
NO.5 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $50,000 for the implementation charges.
Once the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $70,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 85%; Month 8
B. 85%; Month 9
C. 110%; Month 6
D. 110%; Month 8
Answer: C
EMC exam prep E20-017 E20-017 original questions
NO.6 Based on strategic plans regarding green initiatives, an IT department is considering server
consolidation in its data centers.
Which set of elements should be included in the business value analysis to maximize the ROI for such an
initiative?
A. Asset utilization, recovery of stranded assets, and cost of floor space and power
B. Productivity of staff, response to business conditions, and utilization of storage
C. Asset utilization, backup costs, and need for availability
D. Cost of floor space and power, FTE-managed TB of storage, and reduction in SLA penalties
Answer: A
EMC E20-017 E20-017 original questions
NO.7 As represented in the exhibit, a company has a system with three critical components. Each component
must be functioning for the system to be operational.
What is the scheduled availability (percentage) for the system?
A. 84
B. 86
C. 88
D. 90
Answer: C
EMC dumps E20-017 E20-017 certification training
NO.8 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $60,000 for the implementation charges. Once
the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $60,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 35%; Month 6
B. 35%; Month 7
C. 76%; Month 6
D. 76%; Month 7
Answer: D
EMC E20-017 exam dumps E20-017 exam dumps E20-017 demo E20-017 E20-017 pdf
NO.9 In the context of "establishing information availability," what is an operation management activity?
A. Capacity planning
B. Data classification
C. Testing
D. Implementation planning
Answer: A
EMC test questions E20-017 E20-017 E20-017 exam prep
NO.10 As represented in the exhibit, a company has a system with three critical components.
Each component must be functioning for the system to be operational. SLAs have been established
between the business and IT that define normal hours of operations for service as 8 A.M. - 8 P.M.,
Monday through Friday.
What is the availability (percentage) of Component 1?
A. 78
B. 81.7
C. 89
D. 91.7
Answer: B
EMC original questions E20-017 E20-017 test questions E20-017 practice test E20-017 certification
NO.11 The exhibit represents the expected financial results of a storage technology investment.
What does the ® ¯: represent?
A. Cost of investment equals the gain from the investment
B. Asset exceeds liability
C. Deployment cost crosses the planned deployment time
D. Return on investment
Answer: A
EMC test questions E20-017 E20-017 test E20-017
NO.12 In which focus area of the Information Availability Design Framework can seamless movement of data
between tiers of storage be found?
A. Automate
B. Create Copies
C. Distribute
D. Store
Answer: A
EMC E20-017 exam E20-017 test answers E20-017 E20-017 E20-017
NO.13 A company's IT department is comparing two technology proposals. Option 1 would retain legacy
equipment while Option 2 would replace the existing equipment with a new one.
Option 1:
-Total operation costs = $400,000 per year -Annual storage requirements = $100,000 per year
Option 2:
-Initial investment = $1,250,000 -Recurring annual operation costs = $150,000 per year -Annual storage
requirements = $100,000 per year
The company's write-off costs for the legacy equipment is $50,000. As a business analyst using a TCO
analysis, which option would you recommend?
A. Option 1 is feasible if the project lifespan is less than 5 years
B. Option 1 is feasible if the project lifespan is more than 6 years
C. Options 1 and 2 are feasible if the project lifespan is 5 years
D. Option 2 is feasible if the project lifespan is less than 5 years
Answer: A
EMC E20-017 practice test E20-017 questions E20-017 certification training
NO.14 The exhibit represents a Component Failure Impact Analysis (CFIA) for a company's IT infrastructure.
Several Requests for Change (RFC) were raised.
Which RFC should be considered a priority for implementation?
A. Deploying a switch architecture with no single point of failure
B. Clustering the backup server with multiple storage devices
C. Configuring the NAS device in an active-active mode
D. Adding more disk drives to the storage array
Answer: A
EMC questions E20-017 certification E20-017 exam dumps E20-017 certification E20-017 exam simulations
NO.15 A company has estimated a cost of $220,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $30,000 per month. In addition, the
company has agreed to spend $1,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A
EMC exam E20-017 E20-017 E20-017
To help you prepare for E20-017 examination certification, we provide you with a sound knowledge and experience. The questions designed by IT-Tests.com can help you easily pass the exam. The IT-Tests.com EMC E20-017 practice including E20-017 exam questions and answers, E20-017 test, E20-017 books, E20-017 study guide.